Kitchen: Difference between revisions

From Stormsail
Jump to navigation Jump to search
Admin (talk | contribs)
No edit summary
Admin (talk | contribs)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
== Jobs ==
== Jobs ==


* <strike>Bricking up old kitchen door</strike>
* <strike>Bricking up old kitchen door</strike> - completed 23/03/13
* Rip old kitchen out
* Rip old kitchen out - partially - sink left
**try and keep some cupboards in tact to store food etc in dining room whilst fitting kitchen
**try and keep some cupboards in tact to store food etc in dining room whilst fitting kitchen
* Socket location.
* Socket location.
Line 12: Line 12:
** Needs to re-write kitchen and supply mains for new oven.
** Needs to re-write kitchen and supply mains for new oven.
** Also get a new ring main to power the loft.
** Also get a new ring main to power the loft.
** endon lighting led downlight
* Plumbing
* Plumbing
* Plaster boarding ceiling
* Plaster boarding ceiling
* Cat Tunnel
* <strike>Cat Tunnel</strike> - completed 30/03/13
** http://fittingacatorsmalldogflapthroughawall.blogspot.co.uk
** http://fittingacatorsmalldogflapthroughawall.blogspot.co.uk
* Plastering
* Plastering
Line 29: Line 30:
** http://www.appliancesonline.co.uk
** http://www.appliancesonline.co.uk
** http://www.appliancesdirect.co.uk
** http://www.appliancesdirect.co.uk
* Kitchen finishes
** Water filter ->  http://www.kitchen-appliances-direct.co.uk/item-5117-SWICH_Water_Filter_Diverter_.aspx
** Water softener -> Monarch

Latest revision as of 20:29, 23 April 2013

The kitchen unit are being delivered from Wickes on the 21st February 2013. These are the list of jobs and the order required in order to prepare the kitchen for installation.

Jobs