Kitchen: Difference between revisions

From Stormsail
Jump to navigation Jump to search
Admin (talk | contribs)
Created page with "21st February 2013 Jobs Plastering Electrician Tiling Floor Plaster boarding ceiling Bricking up old kitchen door Cat Tunnel Socket location. Plumbing Ceiling light"
 
Admin (talk | contribs)
 
(10 intermediate revisions by 2 users not shown)
Line 1: Line 1:
21st February 2013
The kitchen unit are being delivered from Wickes on the 21st February 2013. These are the list of jobs and the order required in order to prepare the kitchen for installation.


Jobs
== Jobs ==


Plastering
* <strike>Bricking up old kitchen door</strike> - completed 23/03/13
Electrician
* Rip old kitchen out - partially - sink left
Tiling
**try and keep some cupboards in tact to store food etc in dining room whilst fitting kitchen
Floor
* Socket location.
Plaster boarding ceiling
**needed for microwave, toaster, dishwasher, kettle, oven, fridge/freezer plus spares for food processing
Bricking up old kitchen door
* Ceiling light location
Cat Tunnel
* Electrician
 
** Needs to re-write kitchen and supply mains for new oven.
Socket location.
** Also get a new ring main to power the loft.
Plumbing
** endon lighting led downlight
Ceiling light
* Plumbing
* Plaster boarding ceiling
* <strike>Cat Tunnel</strike> - completed 30/03/13
** http://fittingacatorsmalldogflapthroughawall.blogspot.co.uk
* Plastering
* Paint
**can we find an eco paint?
* Floor
** http://www.simplybamboo.co.uk
* Fit kitchen units
** http://www.worktop-express.co.uk/wood_worktops/bamboo_worktops.html
* Worktops
* Tiling
**Fired Earth tiles - check out the sales
* Appliances
** http://www.appliancesonline.co.uk
** http://www.appliancesdirect.co.uk
* Kitchen finishes
** Water filter ->  http://www.kitchen-appliances-direct.co.uk/item-5117-SWICH_Water_Filter_Diverter_.aspx
** Water softener -> Monarch

Latest revision as of 20:29, 23 April 2013

The kitchen unit are being delivered from Wickes on the 21st February 2013. These are the list of jobs and the order required in order to prepare the kitchen for installation.

Jobs