Kitchen: Difference between revisions

From Stormsail
Jump to navigation Jump to search
Admin (talk | contribs)
No edit summary
Admin (talk | contribs)
No edit summary
Line 3: Line 3:
== Jobs ==
== Jobs ==


* <strike>Bricking up old kitchen door</strike>
* <strike>Bricking up old kitchen door</strike> - completed 23/03/13
* Rip old kitchen out
* Rip old kitchen out - partially - sink left
**try and keep some cupboards in tact to store food etc in dining room whilst fitting kitchen
**try and keep some cupboards in tact to store food etc in dining room whilst fitting kitchen
* Socket location.
* Socket location.

Revision as of 11:54, 24 March 2013

The kitchen unit are being delivered from Wickes on the 21st February 2013. These are the list of jobs and the order required in order to prepare the kitchen for installation.

Jobs