Kitchen: Difference between revisions

From Stormsail
Jump to navigation Jump to search
Admin (talk | contribs)
No edit summary
Admin (talk | contribs)
No edit summary
Line 14: Line 14:
* Plumbing
* Plumbing
* Plaster boarding ceiling
* Plaster boarding ceiling
* Cat Tunnel
* <strike>Cat Tunnel</strike> - completed 30/03/13
** http://fittingacatorsmalldogflapthroughawall.blogspot.co.uk
** http://fittingacatorsmalldogflapthroughawall.blogspot.co.uk
* Plastering
* Plastering

Revision as of 14:44, 13 April 2013

The kitchen unit are being delivered from Wickes on the 21st February 2013. These are the list of jobs and the order required in order to prepare the kitchen for installation.

Jobs