Kitchen: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
21st February 2013 | The kitchen unit are being delivered from Wickes on the 21st February 2013. These are the list of jobs and the order required in order to prepare the kitchen for installation. | ||
== Jobs == | == Jobs == | ||
Line 8: | Line 8: | ||
* Ceiling light location | * Ceiling light location | ||
* Electrician | * Electrician | ||
** Needs to re-write kitchen and supply mains for new oven. | |||
** Also get a new ring main to power the loft. | |||
* Plumbing | * Plumbing | ||
* Plaster boarding ceiling | * Plaster boarding ceiling | ||
* Cat Tunnel | * Cat Tunnel | ||
** http://fittingacatorsmalldogflapthroughawall.blogspot.co.uk | |||
* Plastering | * Plastering | ||
* Paint | * Paint |
Revision as of 21:09, 21 January 2013
The kitchen unit are being delivered from Wickes on the 21st February 2013. These are the list of jobs and the order required in order to prepare the kitchen for installation.
Jobs
- Bricking up old kitchen door
- Rip old kitchen out
- Socket location.
- Ceiling light location
- Electrician
- Needs to re-write kitchen and supply mains for new oven.
- Also get a new ring main to power the loft.
- Plumbing
- Plaster boarding ceiling
- Cat Tunnel
- Plastering
- Paint
- Floor
- Fit kitchen units
- Worktops
- Tiling