Kitchen: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
== Jobs == | == Jobs == | ||
Bricking up old kitchen door | * Bricking up old kitchen door | ||
Rip old kitchen out | * Rip old kitchen out | ||
Socket location. | * Socket location. | ||
Ceiling light location | * Ceiling light location | ||
Electrician | * Electrician | ||
Plumbing | * Plumbing | ||
Plaster boarding ceiling | * Plaster boarding ceiling | ||
Cat Tunnel | * Cat Tunnel | ||
Plastering | * Plastering | ||
Paint | * Paint | ||
Floor | * Floor | ||
Fit kitchen units | * Fit kitchen units | ||
Worktops | * Worktops | ||
Tiling | * Tiling |
Revision as of 21:07, 21 January 2013
21st February 2013
Jobs
- Bricking up old kitchen door
- Rip old kitchen out
- Socket location.
- Ceiling light location
- Electrician
- Plumbing
- Plaster boarding ceiling
- Cat Tunnel
- Plastering
- Paint
- Floor
- Fit kitchen units
- Worktops
- Tiling